Advertisement

Ad promo image large
  • Published Date

    May 6, 2019
    This ad was originally published on this date and may contain an offer that is no longer valid. To learn more about this business and its most recent offers, click here.

Ad Text

US 24 at Minturn Roadway Improvements CDOT Construction begins: May 13, 2019 October 2019 US 24 from I-70 to Maloit Park Road (MM 147) Crews On-Site Monday Friday 7 a.m. 7 p.m. Minturn Rd/County Rd Project Start mm 143 mm 144 Rock Scaling Area mm 145 This $6.7 Million project will improve roadway conditions and make safety enhancements throughout the corridor including sidewalks, ADA access, rockfall mitigationCruction and new guardrail Cemetery Road mm 146 Maloit Park Road End of Construction mm 147 TRAFFIC IMPACTS e There will be no traffic holds before 9 a.mm Rockfall mitigation at mm 145 starts May 13 prompting 20-minute traffic holds between 9 a.m. 4:30 p.m Milling and paving begins May 20 at I-70 going south on US 24. Travelers should anticipate delays as we alternate through traffic. Sidewalk and drainage work in town starts in June requiring lane shifts and will limit street parking and sidewalk access as crews move through town The Contractor will notify businesses and residences prior to work directly in front of their property (970) 287-0033 Publicinfo@accbuilt.com https://www.codot.gov/projects/us-6-24-minturn Si desea obtener información en español, por favor comuníquese con nuestro equipo por teléfono al (970) 287-0033 o envie un correo electrónico a publicinfo@accbuilt.com y advertir "Español Por Favor" US 24 at Minturn Roadway Improvements CDOT Construction begins: May 13, 2019 October 2019 US 24 from I-70 to Maloit Park Road (MM 147) Crews On-Site Monday Friday 7 a.m. 7 p.m. Minturn Rd/County Rd Project Start mm 143 mm 144 Rock Scaling Area mm 145 This $6.7 Million project will improve roadway conditions and make safety enhancements throughout the corridor including sidewalks, ADA access, rockfall mitigationCruction and new guardrail Cemetery Road mm 146 Maloit Park Road End of Construction mm 147 TRAFFIC IMPACTS e There will be no traffic holds before 9 a.mm Rockfall mitigation at mm 145 starts May 13 prompting 20-minute traffic holds between 9 a.m. 4:30 p.m Milling and paving begins May 20 at I-70 going south on US 24. Travelers should anticipate delays as we alternate through traffic. Sidewalk and drainage work in town starts in June requiring lane shifts and will limit street parking and sidewalk access as crews move through town The Contractor will notify businesses and residences prior to work directly in front of their property (970) 287-0033 Publicinfo@accbuilt.com https://www.codot.gov/projects/us-6-24-minturn Si desea obtener información en español , por favor comuníquese con nuestro equipo por teléfono al (970) 287-0033 o envie un correo electrónico a publicinfo@accbuilt.com y advertir "Español Por Favor"